Travel calculator
Travel Calculator
The travel calculator calculates the number of minutes for a journey during stage 1 and stage 2 of the Sydney Metro development. Select a stage and search for a start and end location to find out how many minutes it will take below. The number of minutes is displayed below.
Loading map ...
Show me
Featured news
Work powers up to deliver next Metro superstation below the Sydney CBD
Work is in full swing inside Sydney CBD’s deepest underground structure, as Hunter Street Station cavern is prepared to welcome two tunnel boring machines (TBMs) which are about to make their way from Pyrmont.
Sydney Metro West achieves world-first in tunnelling technology
Sydney Metro West has achieved a world-first in tunnel construction with a Lining Erector Machine (LEM) successfully being used to line the mined service tunnels that connect to the future stabling and maintenance facility at Clyde.
Hunter Street Station to unlock Sydney CBD’s longest east-west undercover pedestrian network
The city-shaping potential of Hunter Street Station will be amplified by two underground pedestrian connections which will link commuters directly to services on the M1 metro line at Martin Place and connect the station into a broader, cross-city pedestrian network.
Sydney Metro West tunnels reach end of the line
Tunnel boring machine (TBM) Betty has smashed through into a cavern deep beneath Westmead to complete the first tunnel at the western end of the 24-kilometre Sydney Metro West line.