Rouse Hill Station

Rouse Hill Station is about 12 metres above ground as one of the two stations on the elevated skytrain route.

Main station features

Buses

8 bays

Kiss and ride

25 spaces

Taxis

9 spaces

Bicycles

Parking and storage for 45 bicycles

Located directly outside the Rouse Hill Town Centre and above the existing T-way, the new Rouse Hill Station will service this growing retail and entertainment precinct.

Access and entry

Station access and entry is via Tempus Street adjacent to Rouse Hill Town Centre forecourt.

Construction includes:

  • upgrade and modification of the surrounding roads and footpaths
  • reconfiguration of the bus interchange
  • t-way and road layout reconfigured
  • footpath upgrades along Tempus Street and Windsor Road
  • pedestrian crossings on Tempus Street, Main Street and on the T-way.

Location

The station is located directly outside the Rouse Hill Town Centre and above the existing T-way. Rouse Hill Town Centre is 45 kilometres north west of Sydney central business district (CBD).

Indicative travel time:

  • 55 minutes (including interchange) to Wynyard Station
  • 46 minutes to Sydney Metro’s Martin Place Station (from 2024).
Skytrain construction at Rouse Hill
Skytrain construction at Rouse Hill

Skytrain construction at Rouse Hill

Skytrain construction at Rouse Hill
Construction at Rouse Hill Station
Construction at Rouse Hill Station

Rouse Hill station construction

Rouse Hill station construction
Rouse Hill Station aerial photo
Rouse Hill Station aerial photo

Aerial view over Rouse Hill Town Centre

Aerial view over Rouse Hill Town Centre
Rouse Hill construction site
Rouse Hill construction site

Construction at Tempus Street, Rouse Hill

Construction at Tempus Street, Rouse Hill

Station construction

Area: 18,000 square metres (M2).

Construction activities include:

  • station construction
  • viaduct launch/support
  • station construction and fit-out
  • station precinct works
  • at-grade surface and viaduct systems fit-out
  • testing and commissioning.

Construction of Rouse Hill Station is taking place from late 2016.

Construction updates

22.08.2018
22.08.2018
Northwest update out-of-hours works Rouse Hill - August
PDF | 343.9 KB
Download
21.08.2018
21.08.2018
Construction update Out of hours work Rouse Hill July to August
PDF | 509.34 KB
Download
18.08.2018
18.08.2018
Construction update - Rouse Hill Drive, Windsor Road and Tempus Street out-of hours roadworks
PDF | 270.38 KB
Download
13.08.2018
13.08.2018
Construction update - Rouse Hill Drive, Windsor Road and Tempus Street out-of hours roadworks
PDF | 342.19 KB
Download
06.08.2018
06.08.2018
Construction update - Rouse Hill Drive, Windsor Road and Tempus Street out-of hours roadworks
PDF | 342.53 KB
Download

Tallawong Station

Kellyville Station

Register for updates

Sign up for more Sydney Metro news by email